Car Port on the Move
Disassemble, Move Brendas carport and partially reassemble at house
Fill in house move cut and paint new soffit above front verandah
Put in letterbox
Feb 21 Tues - Dismantle, move and reassemble carport
Over to Brendas to dismantle carport. Dad already been at it and
has outside wall and roofing iron off. Eb up about 10.00 to help.
Take off roofing beams and remove other wall. Dig out poles and find
can easily shift them with concrete still attached.
Roofing rafters will need replacing but everything else is OK.
Put load of long stuff (beams and iron) on Ebs ute and bring over to
house. Take trailer back and load rest of bracing wood and poles.
measure up space, line up and dig holes for poles at house. Put in
poles and rebolt on beams.
Get Eb to swing and reinforce broken wooden gate.
After Eb and Dad gone back to Brendas and pickup last trailer load of
pieces and pile rubbish onto sues trailer for her to take and burn.
Get a few other things from Brendas shed.
Feb 22 Wed
Gloop front join on house and paint that and replacement soffit
over front verandah. Paint beams of carport and letterbox that Eb
bought up yesterday.
Make letterbox seat for post. Dig hole for post,
Put in letterbox post, screw on seat and letterbox and ensure all
solid. Attach letterbox flag using fanblade from old bathroom vent
fan - Shonagh to paint an interesting color.
Nail up wooden gate and put blocking batten in gateway.
Unload shos trailerload of pallets (6) cinderblocks (for an incinerator) and bags of redimix concrete.
Make some concrete and put on bases of carport poles.
Layout rafters for cutting tomorrow.
Feb 23 Thurs.
Get barrowload of straw/compost from red shed for shos garden.
Layout roofing iron for carport and measure and mark roof and rafters.
Cut triangle braces for rafters from old 100x50mm rafter
Drop sho off at airport for trip to Wellington to help sort out her
sisters wedding plans.
Put up front and back rafter over carport beams and nail together.
Out To Makahu.
---- @ Dads doing terratile/earthcrete floor
Feb 24- Feb 26 ( Fri-Sun)
Dad emptied out his glasshouse shed and put boxing up for
concreting floor. Get Will to dump half tractor bucket each of
silt and clay in driveway, Get cement mixer setup.
Lay plastic as vapor barrier and cut and place bamboo lengths on that
for insulation.
one span parallel to screed boards one at right angles - find that
shorter lengths at right angles seems to work better.
Make earthcrete/terratile/stabilised earth mix of silt+clay+cement for
2x4m spans of flooring.
use 4:4:1 (silt:clay:cement) mix for less travelled span
2:2:1 for other span.
Use about 2 1/2 bags cement for about 0.8 cu m.
Comes out thick and sticky like plaster - harder to work/screed than concrete
and needs lotta water to mix and keep plastic.
End up manually smoothing rather than screeding but gives nice smooth
surface. Seems to be drying OK but slower than concrete - surface
still a bit soft (weaker mix) 24 hours after layed and smoothed..
Back to House by midday in time to pickup Sho from airport.
Mon Feb 27
Put rest of rafters on carport roof. Add corner braces to stiffen.
Layout roofing iron and measure up for roof. Start nailing iron on
roof starting with shorter pieces.
Tues Feb 28
Dad up to help with laying large iron sheets.
Pickup some nails and clamps from building supply then get iron onto
roof and nailed into place. Done by 10.30.
Measure and layout edges for shonaghs shade house and wood shed.
Dig end wall post holes, plant poles and cut and nail up framing for
shade house and wood shed on each side of carport. Start nailing iron
onto woodshed roof.
Dad staying for evening, Brenda/Ger and kids over for tea.
Fill in house move cut and paint new soffit above front verandah
Put in letterbox
Feb 21 Tues - Dismantle, move and reassemble carport
Over to Brendas to dismantle carport. Dad already been at it and
has outside wall and roofing iron off. Eb up about 10.00 to help.
Take off roofing beams and remove other wall. Dig out poles and find
can easily shift them with concrete still attached.
Roofing rafters will need replacing but everything else is OK.
Put load of long stuff (beams and iron) on Ebs ute and bring over to
house. Take trailer back and load rest of bracing wood and poles.
measure up space, line up and dig holes for poles at house. Put in
poles and rebolt on beams.
Get Eb to swing and reinforce broken wooden gate.
After Eb and Dad gone back to Brendas and pickup last trailer load of
pieces and pile rubbish onto sues trailer for her to take and burn.
Get a few other things from Brendas shed.
Feb 22 Wed
Gloop front join on house and paint that and replacement soffit
over front verandah. Paint beams of carport and letterbox that Eb
bought up yesterday.
Make letterbox seat for post. Dig hole for post,
Put in letterbox post, screw on seat and letterbox and ensure all
solid. Attach letterbox flag using fanblade from old bathroom vent
fan - Shonagh to paint an interesting color.
Nail up wooden gate and put blocking batten in gateway.
Unload shos trailerload of pallets (6) cinderblocks (for an incinerator) and bags of redimix concrete.
Make some concrete and put on bases of carport poles.
Layout rafters for cutting tomorrow.
Feb 23 Thurs.
Get barrowload of straw/compost from red shed for shos garden.
Layout roofing iron for carport and measure and mark roof and rafters.
Cut triangle braces for rafters from old 100x50mm rafter
Drop sho off at airport for trip to Wellington to help sort out her
sisters wedding plans.
Put up front and back rafter over carport beams and nail together.
Out To Makahu.
---- @ Dads doing terratile/earthcrete floor
Feb 24- Feb 26 ( Fri-Sun)
Dad emptied out his glasshouse shed and put boxing up for
concreting floor. Get Will to dump half tractor bucket each of
silt and clay in driveway, Get cement mixer setup.
Lay plastic as vapor barrier and cut and place bamboo lengths on that
for insulation.
one span parallel to screed boards one at right angles - find that
shorter lengths at right angles seems to work better.
Make earthcrete/terratile/stabilised earth mix of silt+clay+cement for
2x4m spans of flooring.
use 4:4:1 (silt:clay:cement) mix for less travelled span
2:2:1 for other span.
Use about 2 1/2 bags cement for about 0.8 cu m.
Comes out thick and sticky like plaster - harder to work/screed than concrete
and needs lotta water to mix and keep plastic.
End up manually smoothing rather than screeding but gives nice smooth
surface. Seems to be drying OK but slower than concrete - surface
still a bit soft (weaker mix) 24 hours after layed and smoothed..
Back to House by midday in time to pickup Sho from airport.
Mon Feb 27
Put rest of rafters on carport roof. Add corner braces to stiffen.
Layout roofing iron and measure up for roof. Start nailing iron on
roof starting with shorter pieces.
Tues Feb 28
Dad up to help with laying large iron sheets.
Pickup some nails and clamps from building supply then get iron onto
roof and nailed into place. Done by 10.30.
Measure and layout edges for shonaghs shade house and wood shed.
Dig end wall post holes, plant poles and cut and nail up framing for
shade house and wood shed on each side of carport. Start nailing iron
onto woodshed roof.
Dad staying for evening, Brenda/Ger and kids over for tea.