Wednesday, March 01, 2006

Car Port on the Move

Disassemble, Move Brendas carport and partially reassemble at house
Fill in house move cut and paint new soffit above front verandah
Put in letterbox


Feb 21 Tues - Dismantle, move and reassemble carport
Over to Brendas to dismantle carport. Dad already been at it and
has outside wall and roofing iron off. Eb up about 10.00 to help.
Take off roofing beams and remove other wall. Dig out poles and find
can easily shift them with concrete still attached.
Roofing rafters will need replacing but everything else is OK.
Put load of long stuff (beams and iron) on Ebs ute and bring over to
house. Take trailer back and load rest of bracing wood and poles.
measure up space, line up and dig holes for poles at house. Put in
poles and rebolt on beams.
Get Eb to swing and reinforce broken wooden gate.
After Eb and Dad gone back to Brendas and pickup last trailer load of
pieces and pile rubbish onto sues trailer for her to take and burn.
Get a few other things from Brendas shed.

Feb 22 Wed
Gloop front join on house and paint that and replacement soffit
over front verandah. Paint beams of carport and letterbox that Eb
bought up yesterday.
Make letterbox seat for post. Dig hole for post,
Put in letterbox post, screw on seat and letterbox and ensure all
solid. Attach letterbox flag using fanblade from old bathroom vent
fan - Shonagh to paint an interesting color.
Nail up wooden gate and put blocking batten in gateway.
Unload shos trailerload of pallets (6) cinderblocks (for an incinerator) and bags of redimix concrete.
Make some concrete and put on bases of carport poles.
Layout rafters for cutting tomorrow.

Feb 23 Thurs.
Get barrowload of straw/compost from red shed for shos garden.
Layout roofing iron for carport and measure and mark roof and rafters.
Cut triangle braces for rafters from old 100x50mm rafter
Drop sho off at airport for trip to Wellington to help sort out her
sisters wedding plans.
Put up front and back rafter over carport beams and nail together.
Out To Makahu.


---- @ Dads doing terratile/earthcrete floor

Feb 24- Feb 26 ( Fri-Sun)
Dad emptied out his glasshouse shed and put boxing up for
concreting floor. Get Will to dump half tractor bucket each of
silt and clay in driveway, Get cement mixer setup.
Lay plastic as vapor barrier and cut and place bamboo lengths on that
for insulation.
one span parallel to screed boards one at right angles - find that
shorter lengths at right angles seems to work better.

Make earthcrete/terratile/stabilised earth mix of silt+clay+cement for
2x4m spans of flooring.
use 4:4:1 (silt:clay:cement) mix for less travelled span
2:2:1 for other span.
Use about 2 1/2 bags cement for about 0.8 cu m.
Comes out thick and sticky like plaster - harder to work/screed than concrete
and needs lotta water to mix and keep plastic.
End up manually smoothing rather than screeding but gives nice smooth
surface. Seems to be drying OK but slower than concrete - surface
still a bit soft (weaker mix) 24 hours after layed and smoothed..
Back to House by midday in time to pickup Sho from airport.

Mon Feb 27
Put rest of rafters on carport roof. Add corner braces to stiffen.
Layout roofing iron and measure up for roof. Start nailing iron on
roof starting with shorter pieces.

Tues Feb 28
Dad up to help with laying large iron sheets.
Pickup some nails and clamps from building supply then get iron onto
roof and nailed into place. Done by 10.30.
Measure and layout edges for shonaghs shade house and wood shed.
Dig end wall post holes, plant poles and cut and nail up framing for
shade house and wood shed on each side of carport. Start nailing iron
onto woodshed roof.
Dad staying for evening, Brenda/Ger and kids over for tea.

Monday, February 20, 2006

Garage and Yard Tidy

Tidy up and burn rubbish from yard
Builders take away last of their stuff
Jamie painting house interior Overcoat
Finish trim hedge and cut long grass
Fill in gap under garage bearers over piles on two sides of garage
Fence stiles and steps
Put spouting on garage and attach to downpiping.
Make good wood storage area outside garage and move various lumber
stashes onto it
Yard all cleaned up.

Mon Feb 13
Measure up for front porch wood box and boot boxes.
Finish replacing iron sheet section in garage
Tidy up rubbish and wood by hot tub area of house. Arrange beading and
wood stored under house so easily accessible.
Stack up piles of corrugated iron and cleanup rubbish by hedge. Pickup lead
and flashing and store with iron.
Denail some pallet boards.
Unpack some kitchen boxes and Dining room packages

Tues Feb 14 - put up spouting brackets
Dad and Eb up. Get Eb to put in two stiles over railing fence, make
step for back porch while Dad and I remove old spouting brackets from
garage and lay new ones along string line
(70mm drop over 9m - probably overkill).
Fill in broken soffitt on far side of garage.
Get Eb to put corrugated iron siding around garage and dad putting in
rest of spouting brackets while I take Dads brushcutter to rest of barberry
hedge and long grass on hedge side of house.
( note to self - must get brushcutter)
Dad help Eb put new iron on house side of garage wearing my grinder
blade down from 184mm to about 40mm while cutting iron sheets. Cut
last piece with hammer and edge of my axe.
Tidy up grass piles and barberry clippings after they leave.
A whole lotta stuff done today.

Wed Feb 15
Layout seperator lines for Jamie painting Lounge - 2 tone
- dark lavender at top, lighter on bottom 2/3 of walls.
Makes rooms seem much lower.
Tidy up wood and rubbish on RHS of house, Denail old chipbd and place
in plant area
Adjust shed drainage so water not pool on topside of garage.
Go around shed and nail down shed edging over iron Dad and Eb put in
yesterday.
Place iron along back of shed and layout pieces for front between
doors and nail one section into place
Dinner in Town then to movies - "River Queen" - long turgid pointless
(a pretty typical NZ film).

Thurs Feb 16
Layout lines in Dining room for jamie to paint.
Finish yard cleanup.
Move piles round in shed, Put down big pallets and others in front of
car (2 deep) and rearrange rimu wood pile and put cardboard sheeting
down as surface.
V.V. hot day.
Over to Brendas for another load of clothing etc, empty all our stuff out of
her spare room filling car and trailer. Unload into office and spare
room, camping gear into garage.

Fri Feb 17
Placemakers truck arrive with planking, battens and spouting.
Jamie painting Dining room (second coat)
Darryl over with truck - move rubbish pile over to fire pit, douse with
petrol and set fire to it. Load house jacks onto truck
Dad arrive - We put up garage spouting and attach downpiping.
(testing shows water flows downhill in desired direction)
Install kitchen rangehood in afternoon.
Peter and Darryl back in afternoon to pickup last of their stuff and
take away their pile of griptread ( damn!)
Dad left brushcutter so cut long grass by gate (finding a fence post
and some offcuts in process) and decapitate all the docks I can find
in the paddock - in the process of doing that find a pristine offal
hole (complete with concrete cap and lid), some pallets and a 5 gallon
bucket presumably used as a honey bucket.

Shonagh tested that second phone line now working. Thank You Telecom

Sat Feb 18
Setup wood storage pallets on far side of garage. Find handle for
shonaghs gardening wagon and install that.
Move lumber from house from inside garage into neat pile on pallets.
Same for rimu sarking and beam pile under tarp in yard and move
roughsawn railings also to wood store. Cover with tarp.
Yard now cleaned up - landscaping may commence.
Line up with Brenda and Ger to dismantle the old shed/carport at end
of their property and take away. ( Dad idea but they're keen to get
rid of it).

Feb 19-20 Sun- Mon
Out to Makahu with load of pallet wood and rimu to run through
Dads planer. Came out very nicely finished. Get some wood for dad to
make boxes from sawn pile up at Dons and get some rubbish wood from
sawmill slash pile and cut to length for lining outside of Shonaghs
shade house.
Bring back another trailer load of boxes from whare.

Sunday, February 12, 2006

The week of the MOVE-IN

Move boxes from storage into house
Move into house.
Move plants onto property
Appliances into house and installed
Jamie start painting house interior Overcoat
Clip Part of hedge
Washing line installed
Start unpacking boxes.
Phone line in and working

Tues Feb 7 - first night in house
Darryl at house with big truck about 9.00. Two trips down to Stratford to
empty stuff out of storage, bring back up to house and unload.
Big awkward stuff first (light load) then heavy load of crockery + books (:-).
Done by about 1.30.
Storage Bay emptied apart from last 20 boxes of books.
Setup Bed + sleeping bags -
Champers and steak dinner in house on Mums mothers old kitchen table
First night in house.

Wed Feb 8
Jamie painting (overcoat) porch/laundry bathrm + toilet interior
sanding walls between - sho chose a sorta yellow/white color - honey..
Appliances arrive: Fridge, washer and dryer and (later) dishwasher)
Delivery guys installed fridge, washer+dryer (no washer hose guide)
but just dumped dishwasher. Spend afternoon installing that ( prep
under bench surface and screwing into kitchen units so level and firm,
hookup power and water lines in and drainage line out).
Sho found my ipod Xmas present in stored stuff. Setup and leave
charging overnight.

Thurs Feb 9
Install ipod and plug myself into it.
Trip to Stratford in Forester with trailer to empty out and
cleanup storage bay. Leave Jamie painting hall. Pickup last 20 poxes
and 3 pallets and close it down. Back to house and unpack trailer.
Arrange pallets in garage supporting pump and in front of car parking
bay. Finish off garage temp floor front LHS.
Unpack tools and linen+ duvet boxes. Make bed using duvets instead of
sleeping bags. Man we're living now.

Fri Feb 10
Jamie painting hall and entry area.
Cleanup wood from front yard. Measure joist spacing under house for
underfloor insul ( mostly 510mm centers if anyone else is interested).
Over to Sues to pickup 7 pallets and 4 cheese stands on her trailer.
pickup a carload of our stuff from Brendas.
Clean out RHS of garage - put pallets down and move stuff back onto
them off dirt floor. Unload and stack the 3 spare pallets for lumber
storage.
Around this date Telecom finally got (a single) phone line on and working
- we asked for this (2 lines) the week before Xmas.
Charge up, plug in and configure phone.

Sat Feb 11
Finish floor in garage.
Put in washer hose guide and dryer ducting out back of dryer through
floor and under house (clearing 3 things off house Todo list in one day).
Plug doorbell holes in front door surround.
Groceries.
Take trailer down to Timpak and pickup a load of pallet wood. long and
short planks incl 20-30 pieces new unused wood( knotty and/or sappy)
Back and unload wood into stacks
Ipod fiddling - new playlists and culling of boring tracks.

Sun Feb 12
Brenda/Ger and kids and Maree over for brunch - show round house
Brenda and Ger off to look at house section while we look after kids.
Get Finbarr and Diarmaid to setup plant area and help dig hole and make
base for washing line.
Sho get a trailer load of plants from Brendas so unload into plant
area. While doing that get attacked by barberry hedge so attack back -
trim with hand hedge clipper back to rear fenceline
Make concrete and put washing line sleeve in place and leave to set.
Remove an iron sheet section from garage floor and start replacement
with pallet planking (since have lots of planking and corrugated iron
is a bit too flexible underfoot).

Tuesday, February 07, 2006

Flooring and camping

PolyUrethane wood floors ( 3 coats / 4 on travelled areas, sanding between coats)
Old Kitchen Bench units out of house
Setup garage floor


Wed Feb 1
Girls sanding floors (manually). Move stove and use sander on floor behind and some floor patches. Put 3 polyU coats on that and replace stove.
Girls polyU floor when sanding done - run out of polyU halfway up hall
(4 4L tins). Sho bring back 6 more tins but finish up using only about
half a tin.
Sand old scorch marks off hall fireplace surround.
Girls undercoat shos benches out on porch.
Sand MBR skirting after kait wash + go over with meths.
Seal pantry floor and gloop some more holes.
Better to do floor glooping after a coat (at least) of polyU so gloop not
inhibit polyU coating.

Thurs Feb 2
Sand and PolyU hall floor( jamie) and kitchen and doorways off hall - xtra coat on high traffic areas.
Pete and Bob move benches/pantry off porch into garage.
Coopers man by to deliver (small) load of wood stripper system we bought and
show us how to use it.
Cleaning out garage. Move benches and pantry to back wall and put them both up on
blocks. Level out dirt floor (RHS).
Drag sheets of corrugated iron over to garage and layout next to garage wall.
225 mm gap top of piles to ground so need to fill gap between ground and bearer with something.
Pickup Marees trailer from her place and get load of discarded pallet timber from Timberpak (Pallet manufacturer) on way home.

Fri Feb 3
Put in temp floor on garage - coupla pallets at back then 4x2
joists sitting on dirt with pallet planks and old iron as floor surface
Electrician by to fit plug in kitchen and fix switch and bathrm heater
circuit.

Sun Feb 4-6 (Waitangi day)
Out to Makahu for Cousin Wills daughter Libbys Christening and BBQ
at Wills after.
Take vehicles up to scrub paddock by bush and setup camp with
Will+Sam and Jackie+Gerard and all their kids. Me and Cormac+Finbarr
sleeping under Tarp - Shonagh in back of car.
Talking with Will over plans for a bach up there near trees on flat spot.

Tuesday, January 31, 2006

January - Push to handoff

Jan 4-7 - rennovate wood ceilings
Cleanup water stains on ceilings and reoil ceiling panelling
and battens.
Meths + steel wool on Lounge + DR ceiling clears up water damage
(lighter colouring) very nicely - probably just shellaced so meths is spreading old shellac around and evening out color.
Start on office (ceiling was varnished so have to scrape down first - this is a bastard job from hell)

Finish office ceiling scraping, sand (roughly) and oil (meths, boiled linseed oil + turpentine) to bring color back out and remove water stains - works a treat.
Start on spare room - varnish comes off much easier (large strips),
more water came through in here.

Complete spare rm ceiling, sand and oil.
Start on craft rm - varnish not come off v easily but finish (not
much water came through here - just enough to screw up the color without loosening the varnish - pox!). Looks very good once oiled.
Redo/Cleanup patches in LR+DR ceiling.
Electrician in to redo wiring (fm single phase to 2 phase).


Jan 8 Sun
Varnish L+DR architraves, remove some nails from sarking wall

Jan 9-13
Floor tightening and last painting of exterior sections.
Electricity on
Jack up and put piles under garage

Climb under house and put cleats across loose+bowed floorboards in
MBR+Lounge doorways, MBR.
Electrician put in House switches and plugs and wire all up.
Builders gang doing architraves and skirting bds.
Bob fixup gap in Lounge ceiling - just lever/cut out old
nails/brads lever into place and rebrad.

Paint outside over Bobs fixups of Lounge exterior trim and MBR weatherbds
Electricians doing shed wiring - lights and plugs.
Paint over trim and architraves around porch wdw + door after Darryl put them up.

Find wood lengths for kitchen overhang.
Mark up old (standalone) pantry for cutting down so can get it out out the front door.
Spade+scraper on MBR floor to see how much of stuck lino can remove - quite a lot - comes off relatively easily - Peter pointed out this is a waste of effort - floor sander will remove it a treat

Dad came up for a day- spray weeds in yard. Looked at vinyl flooring choices with sho.
Electricity on in house - disconnect shed wiring so can pile shed (so no pump/water)

Glooping gaps, oil+CRC sash wdw pulleys+ inside door mechanisms
Bob+Peter arrive, setup jacks in garageshed and jack it up about 3/4 meter.
Between Me, Bob and Peter dig 3 shed pile holes anchor piles 450x450x900mm deep (a f. big hole). Other piles are non anchor 350x350x450 deep - still serious overkill.

Sho get quotes for floor sanding ~3k the lot, cheapest $900 sand and fill so prob go with that.

Garage Piling:
Digging anchor pile holes (lotsa dirt) - I did 2, Bob did 2 (faster than me). V hard getting dirt out of bottom of deep ones.

Bldg Inspector came and passed the holes. (!)

Coopers wood restoration system guy came and gave us a demo. Very
impressive but exorbitantly expensive ( $150/L ~$6k for materials for
all of house) so we're not going to do that.

Put in piles, concrete on bottom, then pile centered in hole then concrete surround carefully placed to keep pile plumb and centered.
Bob aligning piles, Peter mixing concrete me on barrow.
Finished 7.30 (v tired)

Buiding code demands 225mm from base to top of piles - this leaves shed somewhat higher than needed/desired (sigh!)

Jan 14 Sat
Purchasing (power) tools, electric drill, belt sander, orbital and finishing (finger) sanders ( about $250 the lot). Small vacuum cleaner (Warehouse) for doing ceiling space. garden hosing, other stuff

Jan 15. Sun Get camping gear out of lockup. Showoff house to Shos cousin (Kelly) and his girlfnd.

Jan 16-20 Garage pile completion
Cut and attach garage Bearers
Lower and straighten garage
attach garage to piles
Remove garage bracing
Final Inspection

Replace rotted floorplates in corners of garage.
Cut piles to height (skilsaw 3 sides and handsaw to finish).
Cut floor plate bearers to length, lap joint ends. Not enough wood to do back wall.
Attach outside water hoses.
Start vacuum dirt and crap out of house ceiling space - do about 1/3 of one half.
Jamie (joiner) cut out hole in end hall for stained glass.

Finish doing back wall bearers (w bob) since more wood arrived. Finish cutting bearers (bob pulled off to do something with house movers).
Carriage bolt ends of bearers to batten plate.
Cut off front of old pantry so can remove it out door
Silicon round shower and end of laundry.
Clean old screen remnants from bathrm wdw
Jamie (joiner) put in stained glass wdw and frame laundry opening

Paint outside of bathrm wdw, putty up gaps around glass. gloop/seal top of shower.
Plaster back porch ceiling edges and other gaps.
Cleanup kitchen wdw with triangle scraper and meths.
Test out rimu dap (gap filer) on brad holes in office door and DR openings (works a treat)
Movers turn up and lower garage then bugger off again - didnt straighten it back on the piles.
More vacuuming in ceiling - slow cos hose keeps getting blocked w old fiberglass insulation
Jamie(joiner) working on edging and skirting bds in bathrm + bedrm

Thur Jan 19
Fiddling in roof - cut gap for wires and gloop round laundry vent
Peter + Darryl use Digger to straighten shed - scary application of big machinery.
Paint wood strip for flashing over gap in front gable.
Put 2 Z nails on each pile all round garage. Attach carriage bolts on back bearer.
House inspector check house in afternoon - final inspection.
House pass OK but still need gas and electrical certs fm tradesmen.
Garage needs plate attachments and guttering but pile inspection
passed.
Find drill and sockets and put stainless steel plates on anchor piles (3 screws each side). Plate holes too small for screws so punch to fit and augment with lotta flathead nails and careful appliaction of cursewords.

Fri Jan 20
Help Sam remove bracing from inside of garage.
Paint wood strip for gap fill. Pickup nails. Gloop front gable flashing after Jamie put it up
Leave ~4.00 pack car and off to Opunake

Jan 21-24 Camping at Opunake beach campgrounds

Jan 25 Back to N.P.
House cleanup. Clear out rooms Pile of wood in MBR out to garage.
Jamie fill in holes in MBR floor, skirting and scotia in MBR wardrobe.
Cleanout sawdust from rooms

Thurs Jan 26
Move rest of big stuff out onto porch.
Floor sanders arrive help move benches and wood.
Take off front door to get pantry out onto porch.
Floor sanders doing their stuff - floor sands up nice back to white and pink wood. They fill (major) gaps with colorised jointing compound.
Gloop bathrm skirting, Varnish skirtingboard and trim in bathrm and laundry.
Undercoat behind bath and touchups on walls.
Plugging floor holes in laundry

Fri Jan 27
Floor sanders doing 2nd and 3rd passes through house.
Mix paper strips in water for gap plugging as paper mache
Gloop floor holes in ensuite and plaster holes in gib bd there as well.
Vacuuming in ceiling - finish all of kitchen side and start working back
Sanders finish about 3.00
Head back to Opunake.

Sat+Sun Jan 28-29 Opunake - Sun+sea+surf

Mon Jan 30
Sweep out all rooms and hall - cleanup sanding dust.
Vacuum rooms out again after sweeping. Go over with damp cloth.
Make up some floor gloop paper mache/size and fill worst gaps in
office hall, craftrm and dining rm as a test.
Sho take cheques to lawyer for final signing- just waiting on final
compliance doc delivery to lawyers office.

Tues Jan 31 Final House Purchase done
Setup for polyurethane floors (sho got 4x4L tins yesterday, Carbothane low odour, water based)
Dad by to check out floor. I start polyU first coat at shos craftrm - speed brush on pole, work out and onto rest of floors.
Jamie +Kait arrive ~10.30. Get them doing skirting bds.
Keep on with floor - done about 1.00.
Get girls to run steel wool on dry floors (about 30 mins to dry)
Me and Dad work on fixup garage doors so roll up and down then working on dining room exterior sash window ( broken sash cord).
Girls laying on 2nd polyU coat.
Champagne with dinner - now we are house owners.

Thursday, December 29, 2005

Work round Xmas

Dec24 (Sat)
Spend 4 hours cleaning accumulated debris out of house:
4 bags dust and small bits, coupla other bags and boxes of larger debris (polystyrene packing from oven, joint compound boxes, etc). Looks much better

Dec 25th Xmas Day - nothing done on house.

Dec 26th Mon
Varnish all the new fitted rimu skirting bds, architraves and exposed new wood in Dining room and kitchen hall openings. One coat (matt) about 15% thinned with turps. Wood looks really good.

Tues-Thurs
With Dad + Eb And Jamie and Kaits help put interior undercoat/sealer through all the interior walls.
Do the back Porch/Toilet, Bathroom and all the Bedrooms Tues.
Bedrooms were done fast so its a bit uneven.
Found that the gibstoppers didnt stop around the windows in the bedrooms so leave the edges unpainted pending that being fixed.
Lounge+Dining room and part of Hall Wed - nice clean even job.
Finish Hall, Linen cupboard (Dad calls it the boiler room), Hall, porch and bathroom and Laundry ceilings and do Kitchen Thursday.
Finish by touching up uneven coverage in bedrooms.

Anticipated about 4 buckets (40L) paint - used just under 6 in end - 3 on first day. Best result (for me) seems to be using roller on a pole and working round room. Apply first coat to seal/cover, let dry(mostly) then a cover coat to even it up. Others have slightly different approached none of which give an even a job as my way.

We put a coat on the laundry (painted) panelling and back room ceilings which lightened/cleaned them up a lot.

Looks really good with just white and rimu trim. Havent been able to persuade shonagh we should leave it like that.

Taking new year off to go up to Rotorua.

Friday, December 23, 2005

waiting for stoppers.

Mon Dec 19 to Fri Dec 23

Put colored plastic in Powerline ditch.
Darryl fill ditch in with digger after phone guy laid phone line.

Crawl around under house removing all stored stuff and rubbish while Darryl + Pete finishing house base boards. Make piles of stuff to keep and put some in shed. Pile up rubbish for discard later. Darryl put doors on baseboards for under house access.

Fixup bent floor board by jacking up (car jack) from underneath and cleating it in place. Crawl all over underneath of house andfill up gaps around pipes and old pipe holes in laundry and bathroom.

Nail up face boards around back porch door and where house was cut for moving. Gloop up resulting gaps in weatherboard and paint over.

Plumbers by to finish spouting and plumb waste water line from shower. As final test they hookup generator to pump and test all taps and water entry and exit fixtures.
Roofer by to put flashing on verandah.

Find leak over kitchen window so gloop that up.
Mother stuck in mud by drive where parked it in the morning -- cant drive out so get pickup from sho.


Gib stoppers by for a few hours early in week. Finish stopping, sand walls then put final coating on and take off. Leave a hell of a mess on parts they werent supposed to be plastering (ceiling and floors).Looks like a flock of seagulls have been nesting in the house.

Electrician come take a look at the wiring and physically connect the line from the pole to the fuse box.